Home >> Services >> Data Centre Audit
Are you:
Running out of power in your data centre?
Or
Choosing to upgrade, relocate or outsource to a hosted environment?
Would it be useful to:
- Identify the real capacity of your data centre rather then estimating it using plate values
- Calculate the efficiency of your data centre
- Calculate the real cost of energy use by each server
- Monitor the real current draw of each server
- Manage alerts and events by integrating your power and environmental data into
existing management tools. (Tivoli, HP Open View, Aperture etc)
AIT Partnership Group delivers a range of tools and services that resolve these issues. This
includes four data centre audit options:
Power Audit
By monitoring specific racks of equipment we can build up a very "granular" picture of data
centre consumption to provide real time power consumption figures. We will provide accurate
(Class 1 meters + or -1%) reporting of server consumption.
This report can be used to identify:
- Data centre capacity
- Data centre efficiency
…and prove your business case for investing in virtualisation, intelligent power or a new data
centre.
Data Centre Overview and Audit
Three audit options tailored to your requirements that each provide a comprehensive report. The
'overview' option will identify quick wins and areas requiring further investigation while the
'detailed' audit will give you full documentation of your entire facility, including a complete
inventory of all IT assets in all data centres and other technical rooms.
Audits:
The audits and surveys can be tailored to meet to meet your exact requirements.
- Power Audit - £1,500 (Includes site survey and audit of 2 racks).
- Server and IT device level power consumption
- KWH calculation
- Data Centre Overview - £1,000 per day (minimum 2 days)
- Site location
- M&E layout
- Data centre layout
- Resilient services
- Report of findings
- Identify quick wins
- Summarise longer term improvements
- Data Centre Audit - £1,000 per day (minimum 3 days)
- Site Location
- Data Centre Layout
- Resilient Services
- Building Design, Structure and Adjacencies
- M&E Plant
- Layout
- Age of Systems
- Scalability and Flexibility
- Capacity
- Remaining Service Life
- Power Supplies
- UPS, Generators etc.
- Wiring
- Risk
- Hidden Costs
- Data Centre Management
- Data Centre Security
- Data Centre and operational strategy
- Report of findings
- Identify Strengths and Weaknesses
- Summarise longer term improvements including timescales and cost
- Data Centre Asset Audit - £1,000 per day (minimum of 3 days for Everything in the
Standard Audit plus):
Document every asset in the technical rooms in ExcelTM format
For more information about AIT Partnership Group's Data Centre Audit, see our contact information below.