AIT Logo

Data Centre Audit

Are you:

Running out of power in your data centre?

Or

Choosing to upgrade, relocate or outsource to a hosted environment?

Would it be useful to:

  • Identify the real capacity of your data centre rather then estimating it using plate values
  • Calculate the efficiency of your data centre
  • Calculate the real cost of energy use by each server
  • Monitor the real current draw of each server
  • Manage alerts and events by integrating your power and environmental data into existing management tools. (Tivoli, HP Open View, Aperture etc)

AIT Partnership Group delivers a range of tools and services that resolve these issues. This includes four data centre audit options:

Power Audit

By monitoring specific racks of equipment we can build up a very "granular" picture of data centre consumption to provide real time power consumption figures. We will provide accurate (Class 1 meters + or -1%) reporting of server consumption.

This report can be used to identify:

  • Data centre capacity
  • Data centre efficiency

…and prove your business case for investing in virtualisation, intelligent power or a new data centre.

Data Centre Overview and Audit

Three audit options tailored to your requirements that each provide a comprehensive report. The 'overview' option will identify quick wins and areas requiring further investigation while the 'detailed' audit will give you full documentation of your entire facility, including a complete inventory of all IT assets in all data centres and other technical rooms.

Audits:

The audits and surveys can be tailored to meet to meet your exact requirements.

  1. Power Audit - £1,500 (Includes site survey and audit of 2 racks).
    • Server and IT device level power consumption
    • KWH calculation
  2. Data Centre Overview - £1,000 per day (minimum 2 days)
    • Site location
    • M&E layout
    • Data centre layout
    • Resilient services
    • Report of findings
    • Identify quick wins
    • Summarise longer term improvements
  3. Data Centre Audit - £1,000 per day (minimum 3 days)
    • Site Location
    • Data Centre Layout
    • Resilient Services
    • Building Design, Structure and Adjacencies
    • M&E Plant
      • Layout
      • Age of Systems
      • Scalability and Flexibility
      • Capacity
      • Remaining Service Life
      • Power Supplies
      • UPS, Generators etc.
      • Wiring
      • Risk
      • Hidden Costs
    • Data Centre Management
    • Data Centre Security
    • Data Centre and operational strategy
    • Report of findings
    • Identify Strengths and Weaknesses
    • Summarise longer term improvements including timescales and cost
  4. Data Centre Asset Audit - £1,000 per day (minimum of 3 days for Everything in the Standard Audit plus):

Document every asset in the technical rooms in ExcelTM format

For more information about AIT Partnership Group's Data Centre Audit, see our contact information below.

  • Get help with planning your data centre

Talk to our consultants about how to make your data centre more efficient.